Wednesday 15 April 2026 · 21:51
11 items need your attention.
26 active · 1 dormant · 0 archived
Needs attention
Norway day count (rolling 12-month)
Last verified 7 April: ~178/183 days. Updated rough estimate per Ed (12 April): ~167/183 with worst window at mid-April. Ed in Oslo for 13–19 April camp; post-camp count will be ~173/183. SAFE provided no further Norway exposure beyond this camp. Re-verify after camp ends 19 April.
Cutaway DZ pilot status
First DZ pilot signed 11 April 2026. Day 2 of testing as of 12 April. Not paying, but actively using the product. Needs daily check-in for the first 2 weeks while feedback is rich.
Coaching camps schedule + revenue
Booked: 13–19 Apr (€4,800, in progress), 21–25 Apr (€3,600), 24 Apr–13 May (€3,700), 2–9 May (€8,400), 14–17 May (€1,200), 24 Apr–17 May overlap (€1,200). Past camps confirmed: 19–23 Mar (€4,200) — verify completed.
Wolfgang/David BFS deal status
Met Wolfgang and David in Graz on 10 April 2026. Productive — agreed app terms and website terms. Followed up with David via WhatsApp 11 April with voice message describing what's needed. No response in 5 days. Ball in their court.
Active priorities: Cutaway + LTBJ
Two priority projects: Cutaway (first DZ pilot active) and LTBJ (iOS live, Android port pending). Both have signed partners and revenue paths. All other projects deprioritised as of 12 April 2026.
LTBJ Google Play port + Sam Hardy 60/40
iOS app released. Sam Hardy 60/40 contract signed (Sam 60, Ed 40). Next: develop the Google Play (Android) version. No timeline locked yet.
Cash position
Confirmed through May ~€36K (camps + dev + invoicing). After 17 May: FlyTribe dev ends. Coaching revenue continues but routes through Samavik. Credit card ~£3,863 from A1 + lens. Mum loan £5,100 to repay via DLA. Needs current snapshot.
Coaching cash flow through Samavik (until 17 May)
Samavik FZ-LLC operational. All coaching income from now until 17 May 2026 routes through Samavik (tax-free at the entity level). Ed will draw shareholder loans to pay himself personally until the next Dubai trip in October 2026 when distributions can be formalised.
Wolfgang + David (BFS)
Met both in Graz 10 April 2026. Productive — agreed app and website terms. Voice message sent to David 11 April. No response in 5 days. Ball in their court.
Norway day count (rolling 36-month)
As of 13 Feb: 239/270 with 31 days margin. Aug 2023 22-day block drops out 29 Aug 2026, improving margin to ~53. Re-verify after current camp blocks finish.
Coaching leads pipeline
385 leads in CRM (now at edcracknell.com/admin). Last known: ~37 contacted, ~338 untouched. The 28 Oslo + 31 Malmö 10h leads are the priority untouched segment. Whether the DM blitz happened: needs confirmation.
Recent signals
- processedgit · git_silenceRepo "project-management" has been silent for 0 days (threshold 0.001d). Last commit: 2026-04-13. Affects 24 state items.2 days ago
- filesystem · file_modifiedscripts/linux-git-autopush.sh was modified at 2026-04-12T12:01:02.890Z3 days ago
- filesystem · file_modifiedscripts/mac-git-autopull.sh was modified at 2026-04-12T10:17:32.506Z3 days ago
- filesystem · file_modifiedrevenue/instagram-dm-scripts.md was modified at 2026-04-12T10:17:32.505Z3 days ago
- filesystem · file_modifiedcoaching/LEADS_TRACKER.md was modified at 2026-04-12T10:17:31.834Z3 days ago
- filesystem · file_modifiedcontent/A1_TRANSITION_COST.md was modified at 2026-04-12T10:17:31.837Z3 days ago
- filesystem · file_modifiedrevenue/2026_CAMPS_AND_DEV.md was modified at 2026-04-12T10:17:32.505Z3 days ago
- filesystem · file_modifiedrevenue/TRACKER.md was modified at 2026-04-12T10:17:32.505Z3 days ago